Bridge parapets, pedestrian barriers and passive sign supports all designed to keep road users safe.
Development, manufacture and installation of bespoke pedestrian and vehicle parapets & the design and manufacture of end-to-end VRS barrier solutions.
The A465 Heads of the Valleys project is a major infrastructure upgrade in Wales, focused on enhancing approximately 10 miles of road to improve safety and efficiency.
Commissioned by the Welsh Government, and led by principal contractor FCC Construcción, as part of the Future Valleys Project Consortium, Hill & Smith VRS played a pivotal role in delivering fully tested, end-to-end barrier solutions. Over an 18-month programme, the company has ensured seamless delivery of vehicle restraint systems (VRS) – supplied to Core Highways for installation – and parapets, which were installed by Hill & Smith’s in-house team.
Δ
“Hill & Smith Infrastructure’s reliable supply and technical expertise played a key role in the smooth installation of vehicle restraint systems on this project. Their collaborative approach and flexibility in responding to site challenges ensured that we could maintain efficiency and high safety standards throughout the installation process.” Dan Raffles, Director, Core Highways
“Hill & Smith Infrastructure’s reliable supply and technical expertise played a key role in the smooth installation of vehicle restraint systems on this project. Their collaborative approach and flexibility in responding to site challenges ensured that we could maintain efficiency and high safety standards throughout the installation process.”
Dan Raffles, Director, Core Highways
“Hill & Smith Infrastructure’s team provided exceptional technical support throughout the project, offering innovative solutions that met the evolving demands of the site. Their ability to adapt and collaborate made a significant impact on the project’s success.” Philip Thomas, Senior Planner, FCC
“Hill & Smith Infrastructure’s team provided exceptional technical support throughout the project, offering innovative solutions that met the evolving demands of the site. Their ability to adapt and collaborate made a significant impact on the project’s success.”
Philip Thomas, Senior Planner, FCC
Development, Manufacture and Installation of Bespoke Pedestrian and Vehicle Parapets, and the Design and Manufacture of End-to-End VRS Barrier Solutions.
Development, Manufacture and Installation of Bespoke Pedestrian and Vehicle Parapets, Barriers, Guard Rails on Herring Bridge, Great Yarmouth’s Third River Crossing
The developers of the district needed top-quality, visually appealing building materials to give the new district the impressive appearance that was required. When constructing the Business Bay Crossing Bridge,…
China Harbour Engineering Co. and CCC Highway Consultants issued tenders to agents, ATH-Chevron, detailing the requirements for the supply of 5700 metres of aluminium BACO250 bridge parapet, designed and…
Archirodon Construction and High Point Rendall Engineers approached Mediterranean Building Materials (MBM) to design and supply pedestrian and vehicle parapets for the new prestigious structure. Located in an affluent…
Supply of 18,000 metres of a specially designed three-rail curved aluminium bridge parapet system.